JNU Glacier Highway Improvements | Lemon Creek Area

JNU Glacier Highway Improvements | Lemon Creek Area JNU Glacier Highway Improvements | Lemon Creek Area JNU Glacier Highway Improvements | Lemon Creek Area

JNU Glacier Highway Improvements | Lemon Creek Area

JNU Glacier Highway Improvements | Lemon Creek Area JNU Glacier Highway Improvements | Lemon Creek Area JNU Glacier Highway Improvements | Lemon Creek Area
  • Home
  • Schedule
  • Documents and Maps
  • Contact Us
  • More
    • Home
    • Schedule
    • Documents and Maps
    • Contact Us
  • Home
  • Schedule
  • Documents and Maps
  • Contact Us

Virtual Public Information Office

Virtual Public Information OfficeVirtual Public Information OfficeVirtual Public Information Office
Contact Us

Welcome

This two-year project will resurface and improve Glacier Creek Highway from Glacier Highway Access Road (near the old Walmart) to the intersection with Vanderbilt Road as you are traveling to Twin Lakes.

NOVEMBER 2022 WINTER SHUT DOWN NOTICE

Guardrails will be installed in the project area on Friday, November 18, 2022, through Saturday, November 19, 2022. This is weather permitting and subject to change. 


The Lemon Creek project is scheduled to shut down for the winter after guardrail installation is complete. Construction season spring startup is planned for May 2023 to complete the Anka Street Intersection. Project completion is estimated to be July 2023.

glacier highway vanderbilt hill intersection left turn lane

The signing and traffic marking design sheet for the Vanderbilt Hill Road and Glacier Highway intersection is available for viewing and download below. The permanent features, yet to be installed for this area include:


  • Dedicated crosswalk for bicyclists
  • Rectangular Rapid Flashing Beacon (RRFB) Signs on the shoulders


The initial design removed the left turn lane onto Vanderbilt Hill Road from Old Glacier Highway to install a raised median curb with refuge for crossers and to warn vehicular traffic of crossing bicyclists. Based on recent public comments on this design, the State of Alaska Department of Transportation will remove the planned concrete median and permanently reinstall the left turn acceleration lane at the Vanderbilt Hill Road/Glacier Highway intersection. When weather conditions allow, the painted traffic markings will be installed per the striping plan. The crosswalk ladder and rectangle rapid flashing beacon (RRFB) will be installed in the 2022 construction season.


We appreciate your feedback and take these into consideration in our discussions at the State of Alaska Department of Transportation. An update will be emailed and posted here as design changes occur.

Download PDF

Project Overview

Why is this project needed?

  • The Glacier Highway corridor through the Lemon Creek area is heavily traveled by industrial and passenger vehicles, and non-motorized users (i.e. pedestrians and bicyclists). There are inadequate facilities for non-motorized users and at times there are long delays for vehicles at the Glacier Highway and Vanderbilt Hill Road intersection. 


  • This project will make the road more accessible to pedestrians, including those with disabilities and will improve mobility for bicyclists and transit users while maintaining the existing level of service for  vehicular traffic.

What improvements will be made?

  • The entire length of the roadway will be repaved
  • The Renninger Street intersection will be converted to a roundabout
  • A traffic signal will be added to the Davis Avenue intersection
  • A sidewalk and lighting will be added on the water side of Glacier Highway
  • Pedestrian and bicycle crossings will be added along the corridor
  • Drainage will be improved

How will this affect me?

  • Throughout the project there will be periods of time in      which traffic will be stop controlled. Detours will be in place to accommodate all road users. 
  • Information about traffic conditions, including the current placement of detours, will be posted on the project website and updated weekly via email. To be added to the project’s distribution list, please send an email to info@lemoncrk.com
  • Please remember to use caution when traveling through      the work zones. Watch for and follow direction from flaggers and construction signs.
  • Sidewalks and bicycle lanes within the work zone may be periodically closed, watch for detour signs.

Contact Us

Questions or concerns?

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

We want to hear from you!

Send us a message, or call us to leave a message on the project voicemail. You can also use this contact form to contact the project team, and we will connect back with you. 

To leave a voice message call: (907) 371-2019

Email and phone messages are not actively being monitored during winter shutdown (November 2022 - May 2023). We will respond to your inquiry as soon as possible. Thank you!

Copyright © 2022 DOWL - All Rights Reserved.

Project Name: JNU: Glacier Hwy Improvements - Lemon Creek Area

Project Email: info@lemoncrk.com

Project Voice Mail: (907) 371.2012